That's correct.
I built my house 4 years ago but left the entire lower level with full walkout unfinished, except exterior side windows/drywall...so the past 3 years I have been finishing it on my own--accelerated by quarantine free-time. It is a fairly large undertaking...storage space/workshop, 2 BRs, full bath and big TV room with bar and game space, as well as a huge outdoor kitchen and bar/lounge. Ample TVs were needed for all spaces. Also got Sonos setups, fridge and dishwasher too--taking advantage of the 24 month 0% financing option!