False. They rebuilt the I-35 bridge in Minneapolis in a year after it collapsed in 2007.
Mn/DOT announced on September 19, 2007, that Flatiron Constructors and Manson Construction Co. would build the
replacement bridge for $234 million.
[165] The I-35W Saint Anthony Falls Bridge was opened to the public on September 18, 2008, at 5 a.m.
[166] Using the innovative
design-build project delivery method, the replacement bridge opened over three months ahead of schedule, and was awarded the "Best Overall Design-Build Project Award" for 2009 from the Design-Build Institute of America.
[167]
https://en.wikipedia.org/wiki/I-35W_Mississippi_River_bridge